BUILDER-FIRST / PRECONSTRUCTION INTELLIGENCE
The number is only the ending. Keep the reasoning behind it.
SiteReason is being built to connect scope, subcontractor proposals, bid leveling, estimating, decisions, and owner-facing work—so the knowledge behind every project can inform the next.
We fit to you.
You don't fit to us.
Sources, scope and pricing, connected.
AI Informs. Sources Govern. Humans Decide.
Bid leveling
| Scope item | Sub A | Sub B | Sub C |
|---|---|---|---|
| Window package, types W-01 & W-02Aluminum fixed and casement units | $110,000Included | $108,000Included | $112,000Included |
| Impact-rated glazing, W-03Eight units · from A-601 Window Schedule | $42,000Included | $40,000 plugPlug | $28,000Allowance |
| Flashings, sealants, end damsOpenings and perimeter | $16,000Included | $14,000Included | —Excluded |
| Field testingWater and air at representative units (example) | $8,000Included | $6,000Included | $7,000Included |
| As-submitted total | $176,000 | $128,000 | $147,000 |
| Normalized totalSub B includes the $40,000 plug; Sub C flashing is still pending | $176,000 | $168,000 | $147,000 |
Eight units · A-601 Window Schedule
Sub B includes a $40,000 plug on W-03, set or confirmed by a person.
Quantity mapping
| Takeoff item | Quantity | Classification 1 | Company Cost Codes | Mapping |
|---|---|---|---|---|
| Exterior wall assembly, masonry veneerQTO-EX-014 · Envelope · row 12 | 2,140 SF | C1-110 Exterior Walls | EX-2100 Masonry veneer | High |
| Impact-rated glazing, W-03QTO-EX-014 · Envelope · row 17 · from A-601 Window Schedule | 8 EA | C1-120 Exterior Windows | EX-2150 Impact-rated glazing | High |
| Window package, types W-01 & W-02QTO-EX-014 · Envelope · row 18 | 36 EA | C1-120 Exterior Windows | EX-2140 Window package | High |
| Exterior door openingsQTO-EX-014 · Envelope · row 19 · from A-602 Door Schedule | 6 EA | C1-130 Exterior Doors | EX-2200 Exterior doors | High |
| Roofing membrane, TPOQTO-EX-014 · Envelope · row 24 | 3,200 SF | C1-140 Roofing | EX-2400 Membrane roofing | Needs review |
| Standing-seam metal at baysQTO-EX-014 · Envelope · row 25 | 420 SF | C1-140 Roofing | EX-2410 Metal roofing | Medium |
8 EA · A-601 Window Schedule
Classification 1 C1-120 → Company Cost Code EX-2150
3,200 SF · C1-140 Roofing → EX-2400 Membrane roofing
Drawing schedules
| Mark | Description | Sheet qty | Model | Delta | Status | Drawing schedule |
|---|---|---|---|---|---|---|
| W-01 | Fixed window, 3'-0" × 5'-0" | 12 | 12 | 0 | Match | A-601 Window Schedule |
| W-02 | Casement, 2'-6" × 4'-0" | 8 | 6 | −2 | Mismatch | A-601 Window Schedule |
| W-03 | Impact-rated glazing, 4'-0" × 6'-0" | 8 | 8 | 0 | Match | A-601 Window Schedule |
| W-04 | Transom, 3'-0" × 1'-6" | 4 | 4 | 0 | Match | A-601 Window Schedule |
| D-01 | Exterior entry, 3'-6" × 8'-0" | 2 | 2 | 0 | Match | A-602 Door Schedule |
| D-02 | Sliding glass, 8'-0" × 8'-0" | 3 | 4 | +1 | Mismatch | A-602 Door Schedule |
| D-03 | Service door, 3'-0" × 7'-0" | 2 | 2 | 0 | Match | A-602 Door Schedule |
THE WORK IS CONNECTED. THE TOOLS OFTEN AREN'T.
Drawings live in one place. Subcontractor qualifications in another. Leveling sheets, owner options, and commercial assumptions move between spreadsheets, PDFs, and email.
SiteReason's purpose is to connect those records with the source, the context, and the decision—not simply output another number.
Why source authority mattersONE CONTINUOUS DECISION STORY
Eight connected stages form the intended platform. Current desktop foundations and future capabilities are identified separately—not presented as finished software.
Drawings, specifications, and revisions
Current foundationCoverage, responsibilities, and gaps
Current foundationTrade scope and RFP preparation
Current foundationBidder statements, qualifications, and revisions
In developmentCommercial comparison and human-directed treatment
Current foundationReasons, evidence, and explicit authority
Current foundationTranslate reviewed work into client-facing choices
Product directionReuse approved decision context on future projects
Product direction*“Current foundation” means code was reported present in the audited desktop snapshot. It does not certify a production-ready, end-to-end workflow. Some operations are manual and bounded.
Understand every stageNOT JUST WHAT YOU DECIDED. WHY.
What did the team carry? Which exclusions were accepted? Why was a particular allowance used? What changed after owner review?
SiteReason is designed to make reviewed, authorized decisions and their context useful on future work. Patterns can inform. People decide what becomes company practice.
NO BLACK-BOX AUTHORITY
More precisely: the applicable sources govern the question being answered. Conflicts, superseded information, and unknowns remain visible. The person accountable for the outcome keeps decision authority.
See how the principle worksTHE RIGHT SOFTWARE STARTS WITH THE WAY YOU WORK
SiteReason is shaping its early-access direction around real preconstruction processes. No project files or confidential pricing are requested through this marketing site.